York St John Student Union
Having built a wonderful relationship with York St John Student Union over 15 years working alongside 4 general managers and their staff it was a fitting honour to be part of the team which delivered the new Student Union building facilities.
Working closely alongside Watson Batty Architects and Hall Construction the Whitehead team delivered the bespoke joinery and seating for the bar, coffee bar and reception area’s.
The works comprised:-
- Close collaboration with the design team and main contractor.
- Manufacture and installation of the bar servery counters and backfittings.
- Manufacture, and installation of the bespoke seating.
- Upholstery and polishing.
- Site installation.